Property turnover renovation

K4 cleared, repaired, repainted, and refloored this home from end to end, turning a worn property into a clean, durable, move-in-ready space.

Finished living room after the complete property turnover renovation

One crew. Every stage of the turnover.

The work began with a full trash-out and selective demolition. Once the rooms were cleared, K4 repaired walls and trim, cleaned and treated the exposed subfloor, prepared and painted the interior, and installed new LVP throughout.

The 32-photo sequence follows the job in working order, ending with a room-by-room look at the finished home.

01

Trash out

Clear belongings, debris, and loose material so every room can be fully evaluated.

02

Demolish

Remove worn flooring and damaged finishes to expose the surfaces that need repair.

03

Repair

Patch drywall, correct damaged areas, and clean and treat the exposed subfloor.

04

Prepare & paint

Complete surface preparation, protect the work area, and give walls and trim a clean finish.

05

Install LVP

Lay durable wood-look luxury vinyl plank continuously through the living areas and bedrooms.

06

Finish

Complete the bathrooms, laundry, trim, doors, and final cleanup for a move-in-ready property.

A clean, durable home ready for its next resident.

Fresh walls and trim, repaired rooms, updated baths, and continuous LVP give the property a consistent finish designed for everyday rental use.

Discuss your property project ↗